Baker Water Treatment Plant
-
Location
Lake Forest, CA
-
Owner
Irvine Ranch Water District
-
General Contractor
PCL Construction
Construction of a new 28.1 mgd water treatment plant at the Baker Filtration Plant Facilities which includes a new flow control facility and pump station, forebay pump station and clarifiers, membrane treatment building, disinfection basin, product water clearwell, chemical building, sludge thickening and dewatering facility, site electrical, fire alarm system, instrumentation and system integration.