Southeast Surface Water Treatment Facility
-
Location
Fresno, CA
-
Owner
City of Fresno
-
General Contractor
W.M. Lyles Co.
The Southeast Surface Water Treatment Facility project is a new 58-acre water treatment plant, located in Fresno, CA, designed to treat 80 million gallons per day and provide drinking water from a local river source to the City residents. The treatment process includes pre-treatment basins, ozone disinfection structure, and filters. The facility also includes an 8 million gallon treated water reservoir, chemical building, treated water and backwash pump station, washwater recovery, solids lagoons and pump station, electrical substation, operations building, and a maintenance building.